渭南市MedAccred _AC8102热处理基准审核标准【17】

13.3.2 (EC) Step One - Temperature

REQUIREMEN

T

SHOP PAPER

REQUIREMENT

SET

TEMPERATUR

E

ACTUAL

TEMPERATURES

Temperature

(EC)

(EC)

(EC)

Check if used

Control

(EC)

Recorder

(EC)

High/Low -

Type A or C

Instrumentation

(EC)

Load

Thermocouples

(EC)

13.3.3 (EC) Step One – Time

REQUIREMENT

SHOP PAPER

REQUIREMENT

ACTUAL

Atmosphere

(EC)

(EC)

(EC)

Time and Tolerance

(EC)

(EC)

(EC)

Time loaded into

furnace

Time start of soak

(EC)

Time end of soak

(EC)

Media for Cooling

(EC)

(EC)

(EC)

Cooling Rate

(Excluding Quench)

(EC)

(EC)

(EC)

13.3.4 (EC) Step One – Quench SECTION NA

13.3.4.1 (EC) Step One – Quench

REQUIREMENT

SHOP PAPER

REQUIREMENT

ACTUAL

Quench delay

(EC)

(EC)

(EC)

Quench media %

(EC)

(EC)

(EC)

Quenchant

Temperature Start

(EC)

(EC)

(EC)

Quenchant

Temperature End

(EC)

(EC)

(EC)

Quenchant

Temperature Rise

(EC)

(EC)

(EC)

Quench gauge

calibration

Delay to the next

operation

(EC)

(EC)

(EC)

(0)

相关推荐