18.3.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

18.3.2.1 Step Two Age/PPT/Second Temper

18.3.2.1.1 Furnace used:

18.3.2.1.2 Date part(s) processed:

18.3.2.2 Does the furnace possess the control and recording instrumentation required by the governing specification for this heat treatment? YES/NO

18.3.2.3 (EC) Step Two Age/PPT/Second Temper – Temperature

REQUIREMEN

T

SHOP PAPER

REQUIREMENT

SET

TEMPERATUR

E

ACTUAL

TEMPERATURES

Temperature

(EC)

(EC)

(EC)

Check if used

Control

(EC)

Recorder

(EC)

High/Low -

Type A or C

Instrumentation

(EC)

Load

Thermocouples

(EC)

18.3.3 (EC) Step Two Age/PPT/Second Temper – Time

REQUIREMENT

SHOP PAPER

REQUIREMENT

ACTUAL

Atmosphere

(EC)

(EC)

(EC)

Time and Tolerance

(EC)

(EC)

(EC)

Time loaded into

furnace

Time start of soak

(EC)

Time end of soak

(EC)

Media for Cooling

(EC)

(EC)

(EC)

Cooling Rate

(Excluding Quench)

(EC)

(EC)

(EC)

18.4 Testing for the abbreviated Job #5 SECTION NA

18.4.1 (EC) Testing requirements by Specification, P/O or Drawing

18.4.1.1 (EC) Shop paper testing requirements:

18.4.1.2 (EC) Actual testing performed:

18.5 Job Acceptance

18.5.1 Is the operation signed off or data recorded only after completion? YES/NO

18.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES/NO