IE Training Study in TC/Cur-Mold Shop
1. Object:
Necessary manpower calculation made in TC mold shop.
This study comes from TCcuring shop. There are 13 operators (5 operators / 2*4 shifts, 8 operator/ 3*8shifts) in TC mold shop .The Shop manager and mold technician apply for addmanpower when the presses reach 30. The shop manager will reduce 1 operator at 2*4 shifts and add 3 operators at 3*8 shifts. IE manager is according to shop requisition. Necessary manpowercalculation made in TC mold shop.
Constraints
-PA - PdP
-Quality
-TS 16949 (TC)
-Safety
-IE study is finishedby 07-dec-2001
2. Study organization
2.1 Investigation
Talk with shop manager,technician and operator in order to master main problem in TC mold shop.Understand main work of operator.
Reference documentation:
Collect referencedocumentation in order to master situation of post:
- Organizationaldiagram of work area
- Post description
-PersonnelListing (Grade, Length of service, Vacation, Schedule, Restrictions, Trainingand validation requirements, Others).
-Work method
-Product flow
-Machine & tools
-Material
-Environment
-Layout
-SPEC
Continuous observation
Continuous observation allowsme to gain a thorough understanding of mold post in short term.
2.2 Observation(sample)
Determine unittime of each activity through Observe(see sheet1, 2)
2.3 Data collection
According toproduction record, calculate and statistic frequency of each activity on oneday. (See sheet1, 2)
Workload of Mold2*4 Shift Operators for 26 presses in TC
Sheet1
Activity |
Frequency/day |
Unit Time(min) |
Total |
Repair & rebuild Mold |
2.47 |
90 |
222 |
Assemble Mold |
2.42 |
50 |
242 |
Expertise & receipt Mold |
0.38 |
120 |
45 |
Check container |
0.11 |
600 |
66 |
Wash mold |
0.22 |
180 |
80 |
change mold |
0.41 |
80 |
66 |
Other |
1.00 |
30 |
30 |
Communication |
1 |
120 |
120 |
Total workload 871/shift
Workload of Mold 3*8 ShiftOperators For 25 presses in TC
Sheet 2
Activity |
Frequency/day |
Unit Time(min) |
Total |
Cleaning mold |
3.0 |
60 |
360 |
Wash mold |
1.5 |
180 |
540 |
Change Mold |
2.6 |
80 |
416 |
Deal with CQ |
10.0 |
9.3 |
186 |
Assemble Bladder |
3.3 |
14 |
92 |
Change Bladder |
3.7 |
12 |
88 |
Other |
3.0 |
30 |
180 |
Total workload 621/shift
2.4 manpower calculation
2*4 shifts
%Absenteeism = 8%
Requirement manpower = total workload / open time (480min)
=871/480
=1.81operators
Necessary manpower = Requirement manpower / (1 -%absenteeism)
= 1.81 /(1 – 8 %)
=1.967operators
= 2operators
3*8 shifts
%Absenteeism = 7.2 %
Requirement manpower = total workload / open time (43 0min)
= 621/ 430
=1.44 operators
Necessary manpower =Requirement manpower / (1 - %absenteeism)
= 1.44 / (1 – 7.2 %)
=1.552 operators
= 2 operators
2.5 Occupationcalculation
2*4 shifts
% Occupation =total workload /necessary manpower /open time(480min)
= 871 / 2 / 480
= 91 % /operator
3*8 shifts
% Occupation = total workload /necessarymanpower /open time(430min)
= 621 / 2 / 430
= 65 %/ operator
Absenteeism
If operators want to have CA.we will arrange the third operator of 2*4 shifts to cover CA. So, when oneoperator covers CA, sick leave and so on. The MOLD shops have 1 operator to workat 2*4 shifts. One operator did not work. We will add one operator at 2*4 shifts.
In condition, 11 operatorsare necessary in TC mold shop.
3 Proposal
3.1 TC4650
According to TC4650, theproduction is 4650 good tires, 30 presses will be used. Some activity need bedone.
3.1.1 2*4 shifts
workload
Workload of Mold2*4 Shifts Operators for TC4650 presses in TC
Activity |
Frequency/day |
Unit Time(min) |
Total |
Repair & rework Mold |
2.96 |
90 |
266 |
Assemble Mold |
2.90 |
50 |
290 |
Expertise & receipt Mold |
2.00 |
120 |
240 |
Check container |
0.40 |
480 |
194 |
Wash mold |
0.26 |
180 |
94 |
Changer mold |
0.50 |
80 |
80 |
Other |
1 |
30 |
30 |
Communication |
1 |
120 |
120 |
Totalworkload 1314/shifts
manpower calculation
%Absenteeism = 8 %
Requirement manpower = total workload / open time(480min)
= 1314/480
=2.73 operators
Necessary manpower = Requirement manpower / (1 - %absenteeism)
= 2.73 /(1 – 8 %)
=2.967 operators
= 3 operators
Occupation calculation
% Occupation = total workload / necessary manpower / open time (480min)
= 1314 / 3 / 480
= 92 % / operator
3.1.2 3*8 shifts
Workload
Workload of Mold3*8 Shifts Operators for TC4650 presses in TC
Activity |
Frequency/day |
Unit Time(min) |
Total |
PM |
3.00 |
72 |
432 |
Wash mold |
1.85 |
180 |
666 |
Change Mold |
3.17 |
80 |
507 |
Deal with CQ |
12.00 |
9.3 |
223 |
Assemble Bladder |
5.85 |
14 |
164 |
Change Bladder |
5.85 |
12 |
140 |
Other |
3.00 |
30 |
180 |
Totalworkload 771/shifts
manpower calculation
%Absenteeism =7.2%
Requirement manpower = total workload / open time(430min)
= 771/430
=1.79operators
Necessary manpower= Requirement manpower/(1 -%absenteeism)
= 1.79 / (1 – 7.2 %)
=1.932operators
= 2 operators
Occupation calculation
% Occupation = total workload /necessary manpower /open time(480min)
= 771 / 2 / 430
= 90 % (each operator)
Absenteeism
If operators want to have CA.we will arrange the third operator of 2*4 shifts to cover CA. So, when operatorof 2*4 shifts covers CA, sick leave and so on. The mold shops have 2 operatorsto work at 2*4 shifts. Occupation of 2 operators will reach 134%. We will add one operator at 2*4 shifts.
In condition, 12 operatorsare necessary in TC mold shop.
3.2 PA2002
According to PA2002, theProduction is 3700 good tires, 25presses will be used. Someactivity need be done.
3.2.1 2*4 shifts
Workload of Mold 2*4 Shifts Operators for PA2002 presses in TC
Activity |
Frequency/day |
Unit Time(min) |
Total(min) |
Repair & rework Mold |
2.47 |
90 |
222 |
Assemble Mold |
2.42 |
50 |
242 |
Expertise & receipt Mold |
2.00 |
120 |
240 |
Check container |
0.40 |
600 |
243 |
Other |
1 |
30 |
30 |
Communication |
1 |
120 |
120 |
Total workload 1097/shifts
manpower calculation
%Absenteeism =8%
Requirement manpower = total workload / open time (480min)
= 1097/480
=2.28operators
Necessary manpower= Requirement manpower / (1-%absenteeism)
= 2.28 / (1 – 8%)
= 2.48operators
= 3 operators
Occupation calculation
% Occupation = total workload /necessarymanpower /open time(480min)
= 1097/3 / 430
= 77 %/each operator
Workload of Mold 3*8 Shifts Operators for PA2002 presses in TC
Activity |
Frequency/day |
Unit Time(min) |
Total(min) |
Wash mold |
1.72 |
180 |
619 |
Change Mold |
3.01 |
80 |
482 |
Cleaning mold |
3.0 |
60 |
360 |
Deal with CQ |
10.0 |
9.3 |
186 |
Other |
3.00 |
30 |
180 |
Assemble Bladder |
3.70 |
14 |
104 |
Change Bladder |
3.30 |
12 |
79 |
Totalworkload 670/shifts
manpower calculation
%Absenteeism =7.2%
Requirement manpower = total workload / open time(430min)
= 670/430
=1.55 operators
Necessary manpower= Requirement manpower / (1 -absenteeism)
= 1.55/ (1 – 7.2 %)
=1.679operators
= 2 operators
Occupation calculation
% Occupation = total workload /necessarymanpower /open time(480min)
= 670 / 2 / 430
= 78 % /operator
Absenteeism
If operators want to have CA.we will arrange the third operator of 2*4 shifts to cover CA. So, when thethird operators cover CA, sick leave and so on. The MOLD shops have 2 operatorsto work at 2*4 shifts. Occupation of 2 operators will reach 114%. We will arrange 3*8 shifts to help 2*4shifts. Average Occupation is 90 % (% Occupation = (114%+78%+78%)/3=90%).
In condition, 11 operatorsare necessary in TC mold shop.
4 Conclusion
Meeting
According to PA2002, the meeting decides that the mold shop willreduce 2 operators.
Cost & Gain
11 operators will ensureproduction in TC mold shop. When 2 operators reduced , the company will gain 48,000RMB (2000RMB *12m/year* 2 operators).
“黑俊堂分享会”---斜杠人招募
我们搭建这样的一个“斜杠人”平台—“黑俊堂分享会”。我们每次邀请“斜杠人”进行一小时的分享。
分享的“斜杠人”来自各个方面,并不局限在精益六西格玛,可能来自各个方面的知识;分享嘉宾是某个行业的“大咖”或者是那些低调的“专业人士”,也可能是还没有展露头角的小人物,但在他/她的行业内,有着独到的见解和成功的经验,并愿意在我们搭建平台上作为一个“斜杠人”与广大爱好学习的,愿意不断吸取养分的人去分享。
无论您是做人事管理的,您是做运营的,您是做网站运营的,您是做食品卫生的,您是…
无论您工作在物流业,电商,媒体,生产型企业,商业企业,零售店,教育行业…
您都可以加入我们这个“斜杠人”平台,如果您愿意作为一个“斜杠人”去分享,请扫描堂主的二维码,我们聊聊细节。我们真诚地邀请您的加入: