商洛市MedAccred _AC8102热处理基准审核标准【19】
13.6 Thermal Treatment Step Two Temper SECTION NA
13.6.1 Step Two Temper
13.6.1.1 Furnace used:
13.6.1.2 Date part(s) processed:
13.6.2 Step Two - Temperature
13.6.2.1 What is the basis for determining the tempering temperature for alloy steels?
13.6.2.1.1 Specified in the shop paper:
13.6.2.1.2 As quenched hardness:
13.6.2.1.3 Other (Describe): (EC) Do not describe.
13.6.3 (EC) Step Two Temper – Temperature
REQUIREMEN T |
SHOP PAPER REQUIREMENT |
SET TEMPERATUR E |
ACTUAL TEMPERATURES |
||
Temperature |
(EC) |
(EC) |
(EC) |
||
Check if used |
|||||
Control |
(EC) |
||||
Recorder |
(EC) |
||||
High/Low - Type A or C Instrumentation |
(EC) |
||||
Load Thermocouples |
(EC) |
13.6.4 (EC) Step Two Temper – Time
REQUIREMENT |
SHOP PAPER REQUIREMENT |
ACTUAL |
|
Atmosphere |
(EC) |
(EC) |
(EC) |
Time and Tolerance |
(EC) |
(EC) |
(EC) |
Time loaded into furnace |
|||
Time start of soak |
(EC) |
||
Time end of soak |
(EC) |
||
Media for Cooling |
(EC) |
(EC) |
(EC) |
Cooling Rate (Excluding Quench) |
(EC) |
(EC) |
(EC) |