佛山市MedAccred _AC8121电子电缆和线束组件的审核标准 (41)
19.17 C- During the rework process do the handling, storage and control of the assembly, components and materials meet the requirements of the applicable sections of this checklist?YES/NO
19.18 C- If rework has been performed, is there evidence that cleaning steps required in the procedure have been performed?YES/NO/NA
19.19 C- If used, is the rivet installation, removal, replacement and post replacement inspection being performed as per the procedure?YES/NO/NA
20.PRODUCT CLEANING SECTION NA
20.1 P- Is there a procedure for product cleaning that complies with IPC/WHMA-A-620?YES/NO
20.2 P- If required, are there procedures that ensure the components are compatible with cleaning processes?YES/NO/NA
20.3 P- If used, are there procedures for the setup, operation, and maintenance of cleaning equipment?YES/NO/NA
20.4 P- Are there procedures that define prevention of contamination or damage after cleaning?yes/no
20.5 P- If required, is there a procedure for arrangement / placement in the machine of Cable and Wire Harness assemblies?YES/NO/NA
20.6 C- Are cable and wire harness assemblies cleaned according to procedures?YES/NO
20.7 C- If components are identified as incompatible with the cleaning process, are they protected during cleaning?YES/NO/NA