2020年10月份全球外部检查滞留缺陷汇总
1、CCS-10 月份PSC 滞留情况
序 号 |
船旗 |
建造 年份 |
船型 |
滞留 港 |
滞留 国家 |
滞留 日期 |
滞留缺陷 |
20 |
马邵尔 |
2006 |
散货船 |
温哥华 |
加拿大 |
2020. 10.2 |
1、机舱多处油污严重(MLC 缺陷);2、缺陷证明船舶 SMS 失效,要求外部审核。 |
21 |
巴拿马 |
2010 |
散货 船 |
钏路 |
日本 |
2020. 10.6 |
两名船员任期超过 11 个月,并没有经过船旗国批准展期。 |
22 |
巴拿马 |
2008 |
油船/ 沥青船 |
加尔瓦尔 |
印度 |
2020. 10.6 |
1、2 号发电机无法连接配电板,使用未经批准的甲板发电机;2、应急发电机和救生艇机因电瓶无电无法起动;3、生活区空调不工作;4、集控室报警语言为中文,船员不懂;5、淡水舱测量管锈烂用布包裹;6、6 号压载舱通风管头锈蚀严重。 |
23 |
巴拿马 |
2010 |
散货船 |
新罗西斯克 |
俄罗斯 |
2020. 10.9 |
1、外部火灾警铃不工作;2、公共广播室外喇叭不工作;3、救助艇排水喷射泵损坏、控制面板开关无护罩、控制杆临时修理等;4、驾驶台火灾报警板显示机舱火灾误报警。 |
24 |
中国香港 |
2012 |
散货船 |
丹戎不碌 |
印度尼西亚 |
2020. 10.22 |
1. 救助艇启动失败;2. 救助艇艇吊不能随时可用;3. 进入机舱以及机舱进入舵机舱的防火门破损;4. 生活污水处理装置故障;5. 应急发电机 自动启动试验失败;6. 左右舷机舱通风筒不能关 |
闭;7. ISM 管理体系失效。 |
2、AMSA-9月份滞留情况
港口 |
船型 |
船旗 |
船级社 |
严重缺陷 |
Mourilyan, QLD, Australia |
bulk carrier |
Panama |
DNV GL |
Evidence obtained onboard indicated that more than one set of wage accounts exist. Wages for crew were not in accordance with SEA. |
Gladstone, QLD, Australia |
bulk carrier |
Greece |
DNV GL |
Sewage Treatment Plant defective. |
Newcastle, NSW, Australia |
bulk carrier |
Hong Kong, China |
ABS |
Sewage treatment plant defective. |
Fremantle, WA, Australia |
bulk carrier |
Marshall Islands |
DNV GL |
The Safety Management System, as implemented on board, failed to ensure that the vessel was properly maintained. On this occasion, the oily water separator was found to be defective. |
Gladstone, QLD, Australia |
bulk carrier |
Hong Kong, China |
LR |
The Safety Management System, as implemented on board, did not ensure that critical shipboard equipment and systems were being maintained properly. |
Hatch cover securing arrangements were defective; numerous hatch cover rubber packings & channels defective; most hatch covers' stopper devices were seized, several stopper pins were deformed and hatch covers' associated structures were extensively corroded. |
||||
Brisbane, QLD, Australia |
vehicle carrier |
Norway |
DNV GL |
Emergency generator defective. |
Gladstone, QLD, Australia |
bulk carrier |
Marshall Islands |
LR |
Emergency fire pump defective |
Port Walcott, WA, Australia |
bulk carrier |
Panama |
NKK |
Engine room fire damper no.2 defective - half damper was missing |
Port Hedland, WA,Australia |
bulk carrier |
Marshall Islands |
ABS |
Emergency generator defective. |
Sydney, NSW, Australia |
container ship |
Liberia |
BV |
The Safety Management System, as implemented on board, failed to ensure that the vessel was properly maintained. |
The majority of the cargo hold pontoon cover securing pins were not able to be properly inserted. |
||||
Locking arrangements corroded, damaged or missing. |
||||
The engine room fire damper No. 1 was inoperative - failed to close. |
||||
Port Adelaide, SA, Australia |
bulk carrier |
China |
CCS |
No.4 engine room fire damper defective. |
Hay Point, QLD, Australia |
bulk carrier |
Malta |
BV |
Oily water separator oil content monitoring and control system was found to be defective. |
Abbot Point, QLD, Australia |
bulk carrier |
Malta |
BV |
From the records available on board there is evidence that seafarers are not being paid as per their respective SEAs. |
From the records presented on board there is objective evidence that the company had breached the SEA of some seafarers by requiring them to work excessive hours. This was not in accordance with their SEAs. |
||||
Cadets with SEA requiring 44 hours per week, working 84 hours per week. |
||||
Fremantle, WA, Australia |
oil tanker |
Denmark |
LR |
Engine Room Fan No. 3 fire damper found to be defective. |
3、日本-9月滞留情况
Build year |
Type of ship |
Place of detention |
Date of detention |
Nature of deficiency |
2003 |
VEHICLE CARRIER |
YOKOHAMA, KANAGAWA |
2020-09-10 |
APPLICATION FOR ENDORSMENT OF MASTER EXPIRED |
2004 |
GENERAL CARGO |
ISHIKARI, HOKKAIDO |
2020-09-14 |
STEERING OF LIFEBOAT NOT WORKED; SOME SEAFARERS' EMPLOYMENT AGREEMENTS NOT COMPLIED WITH THE REQUIREMENTS |
2005 |
GENERAL CARGO |
SAKAIDE, KAGAWA |
2020-09-28 |
FIRE INSULATION ON ENGINE ROOM BOUNDARY NOT INSTALLED |
2008 |
GENERAL CARGO |
KAWASAKI, KANAGAWA |
2020-09-29 |
SOME SEAFARERS' EMPLOYMENT AGREEMENTS NOT COMPLIED WITH THE REQUIREMENTS |
4、加拿大-10月滞留情况
Flag |
State |
Vessel Type |
Date of Detention |
Port of Detention |
Nature |
of |
deficiency |
Denmark |
Bulk carrier |
2020-10-29 |
Port-Alfr ed |
· Seafarers' employment agreement (SEA) |
Panama |
Bulk carrier |
2020-10-26 |
Roberts Bank |
· Wages · Seafarers' employment agreement (SEA) |
United States |
General cargo/mul tipurpose |
2020-10-22 |
Grande-An se |
|
Marshall Islands |
Bulk carrier |
2020-10-20 |
Trois-Riv ières |
|
Marshall Islands |
Chemical tanker |
2020-10-15 |
Trois-Riv ières |
|
South Africa |
Oil tanker/NL S tanker |
2020-10-15 |
St John's |
|
Barbados |
Chemical tanker |
2020-10-14 |
Port-Alfr ed |
· Rescueboats · Fire-dampers · ISM RelatedDeficiency · Emergency fire pump and itspipes |
Hong Kong, China |
Bulk carrier |
2020-10-12 |
Vancouver |
· Seafarers' employment agreement (SEA) |
Marshall Islands |
Bulk carrier |
2020-10-02 |
Vancouver |
|
Panama |
Bulk carrier |
2020-10-01 |
Vancouver |
· Other (MARPOL AnnexI) |