2020年10月份全球外部检查滞留缺陷汇总

1、CCS-10 月份PSC 滞留情况

船旗

建造

年份

船型

滞留

滞留

国家

滞留

日期

滞留缺陷

20

马邵尔

2006

散货船

温哥华

加拿大

2020.

10.2

1、机舱多处油污严重(MLC 缺陷);2、缺陷证明船舶 SMS 失效,要求外部审核。

21

巴拿马

2010

散货

钏路

日本

2020.

10.6

两名船员任期超过 11 个月,并没有经过船旗国批准展期。

22

巴拿马

2008

油船/ 沥青船

加尔瓦尔

印度

2020.

10.6

1、2 号发电机无法连接配电板,使用未经批准的甲板发电机;2、应急发电机和救生艇机因电瓶无电无法起动;3、生活区空调不工作;4、集控室报警语言为中文,船员不懂;5、淡水舱测量管锈烂用布包裹;6、6 号压载舱通风管头锈蚀严重。

23

巴拿马

2010

散货船

新罗西斯克

俄罗斯

2020.

10.9

1、外部火灾警铃不工作;2、公共广播室外喇叭不工作;3、救助艇排水喷射泵损坏、控制面板开关无护罩、控制杆临时修理等;4、驾驶台火灾报警板显示机舱火灾误报警。

24

中国香港

2012

散货船

丹戎不碌

印度尼西亚

2020.

10.22

1. 救助艇启动失败;2. 救助艇艇吊不能随时可用;3. 进入机舱以及机舱进入舵机舱的防火门破损;4.  生活污水处理装置故障;5.  应急发电机

自动启动试验失败;6.   左右舷机舱通风筒不能关

闭;7. ISM 管理体系失效。

2、AMSA-9月份滞留情况

港口

船型

船旗

船级社

严重缺陷

Mourilyan,

QLD,

Australia

bulk carrier

Panama

DNV GL

Evidence obtained onboard indicated that more  than

one set of wage accounts  exist. Wages for crew were not in accordance with SEA.

Gladstone,

QLD,

Australia

bulk carrier

Greece

DNV GL

Sewage Treatment Plant  defective.

Newcastle,

NSW,

Australia

bulk carrier

Hong

Kong, China

ABS

Sewage treatment plant  defective.

Fremantle, WA, Australia

bulk carrier

Marshall Islands

DNV GL

The Safety Management System, as implemented on

board, failed to ensure  that the vessel was properly maintained.

On this occasion, the  oily water separator was found to be defective.

Gladstone, QLD,

Australia

bulk carrier

Hong Kong, China

LR

The Safety Management System, as implemented on

board, did not ensure  that critical shipboard equipment and systems were being maintained properly.

Hatch cover securing arrangements were  defective;

numerous hatch cover  rubber packings & channels defective; most hatch covers' stopper devices  were seized, several stopper pins were deformed and hatch covers' associated  structures were extensively corroded.

Brisbane,

QLD,

Australia

vehicle carrier

Norway

DNV GL

Emergency generator  defective.

Gladstone,

QLD,

Australia

bulk carrier

Marshall Islands

LR

Emergency fire pump  defective

Port Walcott,

WA, Australia

bulk

carrier

Panama

NKK

Engine room fire damper no.2 defective - half  damper

was missing

Port

Hedland, WA,Australia

bulk carrier

Marshall Islands

ABS

Emergency generator  defective.

Sydney,

NSW,

Australia

container ship

Liberia

BV

The Safety Management System, as implemented on

board, failed to ensure  that the vessel was properly maintained.

The majority of the cargo hold pontoon cover

securing pins were not  able to be properly inserted.

Locking arrangements  corroded, damaged or missing.

The engine room fire damper No. 1 was  inoperative -

failed to close.

Port

Adelaide, SA, Australia

bulk carrier

China

CCS

No.4 engine room fire  damper defective.

Hay Point,

QLD,

Australia

bulk carrier

Malta

BV

Oily water separator oil  content monitoring and control system was found to be defective.

Abbot Point, QLD,

Australia

bulk carrier

Malta

BV

From the records available on board there is  evidence

that seafarers are not  being paid as per their respective SEAs.

From the records presented on board there is

objective evidence that  the company had breached the SEA of some seafarers by requiring them to work  excessive hours. This was not in accordance with their SEAs.

Cadets with SEA requiring 44 hours per week,  working

84 hours per week.

Fremantle,

WA, Australia

oil tanker

Denmark

LR

Engine Room Fan No. 3 fire damper found to be

defective.

3、日本-9月滞留情况

Build year

Type of ship

Place of detention

Date of detention

Nature of deficiency

2003

VEHICLE

CARRIER

YOKOHAMA,

KANAGAWA

2020-09-10

APPLICATION FOR ENDORSMENT OF MASTER EXPIRED

2004

GENERAL CARGO

ISHIKARI, HOKKAIDO

2020-09-14

STEERING OF LIFEBOAT NOT WORKED;

SOME SEAFARERS'  EMPLOYMENT AGREEMENTS NOT COMPLIED WITH THE REQUIREMENTS

2005

GENERAL

CARGO

SAKAIDE,

KAGAWA

2020-09-28

FIRE INSULATION ON ENGINE ROOM BOUNDARY NOT

INSTALLED

2008

GENERAL CARGO

KAWASAKI, KANAGAWA

2020-09-29

SOME SEAFARERS' EMPLOYMENT AGREEMENTS NOT COMPLIED WITH THE  REQUIREMENTS

4、加拿大-10月滞留情况

Flag

State

Vessel Type

Date of Detention

Port of Detention

Nature

of

deficiency

Denmark

Bulk carrier

2020-10-29

Port-Alfr ed

·          Seafarers' employment agreement  (SEA)

Panama

Bulk carrier

2020-10-26

Roberts Bank

·          Wages

·          Seafarers' employment agreement  (SEA)

United States

General cargo/mul tipurpose

2020-10-22

Grande-An se

Marshall Islands

Bulk carrier

2020-10-20

Trois-Riv ières

Marshall Islands

Chemical tanker

2020-10-15

Trois-Riv ières

South Africa

Oil tanker/NL S tanker

2020-10-15

St John's

Barbados

Chemical tanker

2020-10-14

Port-Alfr ed

·          Rescueboats

·          Fire-dampers

·          ISM RelatedDeficiency

·          Emergency fire pump and itspipes

Hong Kong, China

Bulk carrier

2020-10-12

Vancouver

·          Seafarers' employment agreement  (SEA)

Marshall Islands

Bulk carrier

2020-10-02

Vancouver

Panama

Bulk carrier

2020-10-01

Vancouver

·          Other (MARPOL AnnexI)

(0)

相关推荐