黄石市MedAccred _AC8121电子电缆和线束组件的审核标准 (63)

30.5.9 C- Is there evidence that contact retention verification and / or testing is accomplished prior to addition of any restraining devices?YES/NO/NA

30.6Connector Testing

30.6.1 P- If required by the customer, is there a procedure for testing connector seals for water / leakage / etc.?YES/NO/NA

30.6.2 C- If required by the customer is there evidence of seal testing for water

/ leakage / etc.?YES/NO

30. MOLDING SECTION NA

31.1 Molding Process SECTION NA

31.1.1 P- Is there a procedure to define and control the molding material, including:

31.1.1.1 P- Cleanliness requirements of parts to be adhered?YES/NO

31.1.1.2 P- Shelf-life of materials to be used?YES/NO

31.1.1.3 P- Work time after mixing / pot life?YES/NO

31.1.1.4 P- Methods of adhesive application and removal?YES/NO/NA

31.1.1.5 P- Application and removal of temporary masking material?YES/NO/NA

31.1.1.6 P- Set up, configuration, and cleaning of tools, jigs, fixtures, nozzles, racks, etc.?YES/NO

31.1.1.7 P- Calibration of gauges, scales, etc.?YES/NO/NA

31.1.1.8 P- Environmental control (humidity, temperature, FOD, ventilation, etc.)

in room?YES/NO

31.1.1.9 P- Set up, use, preventative maintenance, and calibration of curing ovens?YES/NO/NA

Audit Note: NA only applies when ovens are not used (i.e. air cure only).

(0)

相关推荐