怀化市MedAccred _AC8121电子电缆和线束组件的审核标准 (77)

35.5.3 C- Is there evidence that assembly of swage type connectors has been completed in accordance with procedures?YES/NO

35.5.4 C- Is there evidence that acceptance criteria for the assembly of swage type connectors is available and followed?YES/NO

35.6 Soldering and Stripping of Biaxial Wire SECTION NA

35.6.1 P- Is there a procedure for the assembly of connectors using biaxial wire?YES/NO

35.6.2 P- Is there evidence for a link between manufacturer’s recommended instructions and / or design requirements for the biaxial wire and shop floor instructions?YES/NO

35.6.3 P- Is there a procedure for the acceptance criteria for the assembly of connectors using biaxial wire?YES/NO

35.6.4 P- Are the procedures for soldering of biaxial wire assemblies linked to general soldering requirements?YES/NO

Audit Note: Linking to general soldering requirements ensures that any tooling, material, process, etc. controls for biaxial wire assembly soldering has been addressed.

35.6.5 C- Is there evidence that assembly of connectors using biaxial wire is completed in accordance with procedures?YES/NO

35.6.6 C- Is there evidence that acceptance criteria for the assembly of connectors using biaxial wire is available and followed?YES/NO

35.6.7 C- Is there evidence that operators performing soldering of biaxial wire connector assemblies are trained to the documented general hand soldering requirements of IPC/WHMA-A-620 / customer requirements / procedures?YES/NO

(0)

相关推荐