毕节市MedAccred _AC8102热处理基准审核标准【30】
15.4 Testing for the abbreviated Job #2 SECTION NA
15.4.1 (EC) Testing requirements by Specification, P/O or Drawing
15.4.1.1 (EC) Shop paper testing requirements:
15.4.1.2 (EC) Actual testing performed:
15.5 Job Acceptance
15.5.1 Is the operation signed off or data recorded only after completion? YES/NO
15.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES/NO
16. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB SECTION NA
16.1 Job #3 Identity
16.1.1 Purchase order number:
16.1.2 Customer:
16.1.3 Job number, Part number:
16.1.4 Part description:
16.1.5 Part size:
16.1.6 Maximum part thickness:
16.1.7 Number of parts:
16.1.8 (EC) Material alloy, Material specification (if available):
16.1.9 (EC) Heat Treating specification:
16.1.10 (EC) Heat treat and other process and test requirements specified by customer specification (i.e. fixed process approval):
16.1.11 (EC) Pre-heat treatment requirements (cleaning, plating, etc.)
16.1.12 (EC) Pre-heat treatment actually performed:
16.2 Thermal Treatment Step One SECTION NA
16.2.1 Step One
16.2.1.1 Furnace Used:
16.2.1.2 Date part(s) processed:
16.2.2 Does the furnace possess the control and recording instrumentation required by the governing specification for this heat treatment? YES/NO
16.2.3 (EC) Step One – Temperature
REQUIREMEN T |
SHOP PAPER REQUIREMENT |
SET TEMPERATUR E |
ACTUAL TEMPERATURES |
||
Temperature |
(EC) |
(EC) |
(EC) |
||
Check if used |
|||||
Control |
(EC) |
||||
Recorder |
(EC) |
||||
High/Low - Type A or C Instrumentation |
(EC) |
||||
Load Thermocouples |
(EC) |