15.4 Testing for the abbreviated Job #2 SECTION NA

15.4.1 (EC) Testing requirements by Specification, P/O or Drawing

15.4.1.1 (EC) Shop paper testing requirements:

15.4.1.2 (EC) Actual testing performed:

15.5 Job Acceptance

15.5.1 Is the operation signed off or data recorded only after completion? YES/NO

15.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES/NO

16. COMPLIANCE AUDIT OF ABBREVIATED IN-PROCESS HEAT TREATING JOB SECTION NA

16.1 Job #3 Identity

16.1.1 Purchase order number:

16.1.2 Customer:

16.1.3 Job number, Part number:

16.1.4 Part description:

16.1.5 Part size:

16.1.6 Maximum part thickness:

16.1.7 Number of parts:

16.1.8 (EC) Material alloy, Material specification (if available):

16.1.9 (EC) Heat Treating specification:

16.1.10 (EC) Heat treat and other process and test requirements specified by customer specification (i.e. fixed process approval):

16.1.11 (EC) Pre-heat treatment requirements (cleaning, plating, etc.)

16.1.12 (EC) Pre-heat treatment actually performed:

16.2 Thermal Treatment Step One SECTION NA

16.2.1 Step One

16.2.1.1 Furnace Used:

16.2.1.2 Date part(s) processed:

16.2.2 Does the furnace possess the control and recording instrumentation required by the governing specification for this heat treatment? YES/NO

16.2.3 (EC) Step One – Temperature

REQUIREMEN

T

SHOP PAPER

REQUIREMENT

SET

TEMPERATUR

E

ACTUAL

TEMPERATURES

Temperature

(EC)

(EC)

(EC)

Check if used

Control

(EC)

Recorder

(EC)

High/Low -

Type A or C

Instrumentation

(EC)

Load

Thermocouples

(EC)

(0)